Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6260 How Coty Cut $270k in Costs - Beauty Packaging
Beauty Industry

How Coty Cut $270k in Costs

Steve Wise explains how the company used a real-time manufacturing Intelligence platform to evaluate its filling processes.

Coty used a real-time manufacturing Intelligence platform to evaluate its filling process and cut costs – saving over $270k.

The manufacturing team at Coty’s Sanford, N.C., facility turned to statistical process control (SPC) analysis to better understand scrap at the point of manufacture on these filling lines.

Steve Wise, vice president of statistical methods, InfinityQS International, Inc., explains how in Beauty Packaging’s Online Exclusive: Coty Saves Over $270,000 with Statistical Process Control.

Add us as a preferred source on Google

Get the latest Beauty Packaging news, insights and analysis in your Google Search and AI experiences.

Keep Up With Our Content. Subscribe To Beauty Packaging Newsletters